Container programs

Corrugated boxes bought by the full 40-foot high-cube container: one size or several, once or on repeat, with written approvals and a load plan for every container.

Container ships at berth under ship-to-shore cranes at a container terminal
Photo: Julia Taubitz, Unsplash

Why buy by the container

Corrugated boxes ship flat, so a 40-foot high-cube carries tens of thousands of them. Buying a full container spreads the freight, clearance and delivery cost over the whole load, and lets one container carry the range of sizes a warehouse uses. Buying direct from the plant, without a stockholding layer in between, keeps the price per box down.

Program types

Single-size loads

One size in one board grade fills the container. The simplest load to plan and the lowest cost per box.

Mixed loads

Several sizes, grades or print versions share one container, each palletized and labeled on its own. Suited to distributors keeping a range in stock.

Repeat programs

Specifications and drawings approved once and reordered container by container, so each repeat order is quoted and produced against the same approved standard.

How an order runs

  1. Specification

    You send the inside dimensions, style, board, print and quantity for each size. Where the specification is still open, we propose the style and grade from the product, its packed weight and how it ships.

  2. Quotation

    The quotation gives the price per box, the Incoterm and the named place, what the price includes, the production lead time, and boxes per bundle, per pallet and per container for each size.

  3. Drawings and proofs

    Every size gets a dieline with inside and outside dimensions. Printed boxes get a proof on the dieline. Production starts only after you approve both in writing.

  4. Sample, where needed

    Where fit matters, a 1:1 sample is cut from production board and checked against your product before the full run.

  5. Production

    Production typically takes up to 15 days from order confirmation. The plant works to the approved drawing and proof; dimensions are inside dimensions and the design files are followed exactly.

  6. Load plan and loading

    Each container is planned before it is loaded: pallet pattern, pallet count and the bundles that fill the remaining space. The plan goes to the plant with the packing requirements.

  7. Documents and customs

    The commercial invoice, packing list and bill of lading are issued at loading. The Importer Security Filing is made before the container goes aboard, and the entry is filed for clearance on arrival.

  8. Delivery

    On delivered terms the container is cleared and trucked to your dock on an appointment set with your receiving team.

Timing

Drawings and proofs
Issued after the quotation is accepted
Production
Typically up to 15 days from order confirmation
Ocean transit
Stated on the quotation for the sailing booked
Clearance and delivery
Planned against the vessel’s arrival

What is agreed in writing

  • The quotation: price per box, Incoterm and named place, inclusions and lead time
  • The drawing for every size, with inside and outside dimensions
  • The print proof, with colors and clearances
  • The purchase order, naming sizes, quantities, grades and packing
  • The load plan for each container

Further reading

Ready to buy direct?

Send the product, sizes, grade and quantities. The quotation names the Incoterm, the lead time and the units per pallet and per container for every item.